Deansgate
2,644 delay minutes
The biggest share (16%) of the delay picked up at Deansgate in the four weeks to 9 December 2023 came from traincrew problems.
79% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 149 | 6% | 8% | 5 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 283 | 11% | 16% | 10 a day, more than 2 of the other 4 years | - |
| Weather and structures | 176 | 7% | 7% | 6 a day, more than 3 of the other 4 years | - |
| Autumn | 230 | 9% | 7% | 8 a day, more than 3 of the other 4 years | - |
| External | 168 | 6% | 4% | 6 a day, the most in 5 years | - |
| Network management | 368 | 14% | 17% | 13 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 410 | 16% | 16% | 15 a day, more than 2 of the other 4 years | - |
| Traincrew | 421 | 16% | 11% | 15 a day, more than 3 of the other 4 years | - |
| Stations | 82 | 3% | 3% | 3 a day, more than 1 of the other 4 years | - |
| Operations | 165 | 6% | 5% | 6 a day, more than 3 of the other 4 years | - |
| Operator, other | 192 | 7% | 7% | 7 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 241 |
| TH | (Senior) Conductor/Train Manager | 143 |
| Q3 | NZ Pumps T | 132 |
| TT | Leaf fall Neutral | 127 |
| XP | BRIDGE HIT | 118 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 94 |
| OU | Delays not Investigated by Network Rail | 81 |
| QJ | Special working for leaf-fall track circuit operation | 80 |
| IW | Non severe weather - snow/ice/frost affecting infrastructure equipment excluding points | 76 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 68 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,782 |
| MD | Technical failures below the solebar | 5,920 |
| IC | Track circuit failure (including no fault found) | 4,319 |
| TH | (Senior) Conductor/Train Manager | 3,431 |
| M7 | Door and Door system faults | 3,375 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,339 |
| M8 | Technical failures above the Solebar | 3,140 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,126 |
| IB | Points failure (including no fault found) | 2,589 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 2,455 |