Didcot Parkway
3,474 delay minutes
The biggest share (23%) of the delay picked up at Didcot Parkway in the four weeks to 9 December 2023 came from track faults.
76% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 790 | 23% | 8% | 28 a day, the most in 5 years | 1 |
| Signals, points and power | 564 | 16% | 16% | 20 a day, more than 2 of the other 4 years | 4 |
| Weather and structures | 111 | 3% | 7% | 4 a day, the most in 5 years | - |
| Autumn | 59 | 2% | 7% | 2 a day, the least in 5 years | - |
| External | 45 | 1% | 4% | 2 a day, the least in 5 years | - |
| Network management | 738 | 21% | 17% | 26 a day, more than 1 of the other 4 years | 27 |
| The operators' causes | |||||
| Train faults | 475 | 14% | 16% | 17 a day, more than 1 of the other 4 years | 22 |
| Traincrew | 370 | 11% | 11% | 13 a day, more than 2 of the other 4 years | 6 |
| Stations | 47 | 1% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 94 | 3% | 5% | 3 a day, more than 2 of the other 4 years | 1 |
| Operator, other | 182 | 5% | 7% | 6 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 431 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 266 |
| TG | Driver | 266 |
| OU | Delays not Investigated by Network Rail | 215 |
| IB | Points failure (including no fault found) | 208 |
| I2 | AC/DC trip (including no fault or cause found) | 186 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 109 |
| M7 | Door and Door system faults | 94 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 86 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 73 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 10,316 |
| J3 | Axle Counter Failure | 9,381 |
| ZU | No Cause Identified After investigation by both Parties | 7,775 |
| IB | Points failure (including no fault found) | 7,688 |
| MD | Technical failures below the solebar | 7,301 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,077 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5,992 |
| M8 | Technical failures above the Solebar | 5,803 |
| IA | Signal failure (including no fault found) | 4,829 |
| I1 | Overhead line/third rail defect | 4,813 |