290 delay minutes

The biggest share (32%) of the delay picked up at Diss in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.

50% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track155%8% 1 a day, more than 2 of the other 4 years1
Signals, points and power3612%16% 1 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn227%7% 1 a day, more than 2 of the other 4 years-
External9232%4% 3 a day, the most in 5 years-
Network management4515%17% 2 a day, more than 1 of the other 4 years-
The operators' causes
Train faults72%16% 0 a day, the least in 5 years-
Traincrew83%11% 0 a day, more than 1 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other6623%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XPBRIDGE HIT84
V8Train striking or being struck by a bird22
IISignalling lineside cable fault21
FWLate start/yard overtime not explained by Operator18
I8Animal Strike or Incursion within the control of Network Rail16
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.15
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)14
Q3NZ Pumps T14
TTLeaf fall Neutral14
ACWaiting Train preparation or completion of TOPS list/RT397313
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)3,199
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,404
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,286
IASignal failure (including no fault found)969
XPBRIDGE HIT952
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles950
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions887
MCDiesel Loco failure, defect, attention743
MDTechnical failures below the solebar676
JSCondition of Track TSR outside the Timetable Planning Rules645