Dalston Kingsland
43 delay minutes
The biggest share (28%) of the delay picked up at Dalston Kingsland in the four weeks to 9 December 2023 came from problems at stations.
40% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 9 | 21% | 8% | - |
| Signals, points and power | 6 | 14% | 16% | 1 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | 1 |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 12 | 28% | 3% | 2 |
| Operations | 4 | 9% | 5% | - |
| Operator, other | 12 | 28% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RB | Passengers joining/alighting | 9 |
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 8 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 6 |
| TR | Train Operating Company Directive | 4 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 4 |
| I1 | Overhead line/third rail defect | 3 |
| IA | Signal failure (including no fault found) | 3 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 258 |
| J3 | Axle Counter Failure | 161 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 159 |
| ML | Wagons, coaches and parcel vehicle faults | 144 |
| MD | Technical failures below the solebar | 134 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 127 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 121 |
| IB | Points failure (including no fault found) | 117 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 112 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 97 |