43 delay minutes

The biggest share (28%) of the delay picked up at Dalston Kingsland in the four weeks to 9 December 2023 came from problems at stations.

40% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track921%8%-
Signals, points and power614%16%1
Weather and structures--7%-
Autumn--7%-
External--4%1
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations1228%3%2
Operations49%5%-
Operator, other1228%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
RBPassengers joining/alighting9
ACWaiting Train preparation or completion of TOPS list/RT39738
IRBroken/cracked/twisted/buckled/flawed rail6
TRTrain Operating Company Directive4
VHPassenger Communication cord, door egress or emergency train alarm operated4
I1Overhead line/third rail defect3
IASignal failure (including no fault found)3
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3
R7Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts)3
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver258
J3Axle Counter Failure161
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail159
MLWagons, coaches and parcel vehicle faults144
MDTechnical failures below the solebar134
X8Animal Strike or incursion not within the control of Network Rail127
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards121
IBPoints failure (including no fault found)117
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)112
MNBrake and brake systems faults; including wheel flats where no other cause had been identified97