Downham Market
274 delay minutes
Most of the delay picked up at Downham Market in the four weeks to 9 December 2023 came from signal, points and power faults.
46% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 3% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 151 | 55% | 16% | 5 a day, the most in 5 years | - |
| Weather and structures | 1 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 6 | 2% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 4 | 1% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 19 | 7% | 17% | 1 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 36 | 13% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 3 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 45 | 16% | 7% | 2 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 131 |
| TG | Driver | 26 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 22 |
| FW | Late start/yard overtime not explained by Operator | 15 |
| IB | Points failure (including no fault found) | 10 |
| TI | Traincrew rostering problem | 10 |
| OU | Delays not Investigated by Network Rail | 9 |
| IK | Telecom equipment failure (including no fault found) | 6 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 6 |
| QJ | Special working for leaf-fall track circuit operation | 6 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11,903 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,717 |
| IC | Track circuit failure (including no fault found) | 1,301 |
| TG | Driver | 1,277 |
| I1 | Overhead line/third rail defect | 1,136 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 782 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 725 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 633 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 533 |
| IB | Points failure (including no fault found) | 506 |