Leaves on the Line

Downham Market

DOW Anglia route
CSV JSON

274 delay minutes

Most of the delay picked up at Downham Market in the four weeks to 9 December 2023 came from signal, points and power faults.

46% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track93%8% 0 a day, the least in 5 years-
Signals, points and power15155%16% 5 a day, the most in 5 years-
Weather and structures1<1%7% 0 a day, more than 1 of the other 4 years-
Autumn62%7% 0 a day, more than 3 of the other 4 years-
External41%4% 0 a day, more than 2 of the other 4 years-
Network management197%17% 1 a day, the least in 5 years-
The operators' causes
Train faults--16% 0 a day, the least in 5 years-
Traincrew3613%11% 1 a day, more than 3 of the other 4 years-
Stations31%3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other4516%7% 2 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)131
TGDriver26
VHPassenger Communication cord, door egress or emergency train alarm operated22
FWLate start/yard overtime not explained by Operator15
IBPoints failure (including no fault found)10
TITraincrew rostering problem10
OUDelays not Investigated by Network Rail9
IKTelecom equipment failure (including no fault found)6
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)6
QJSpecial working for leaf-fall track circuit operation6
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.11,903
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,717
ICTrack circuit failure (including no fault found)1,301
TGDriver1,277
I1Overhead line/third rail defect1,136
IRBroken/cracked/twisted/buckled/flawed rail782
JHCritical Rail Temperature speeds, (other than buckled rails)725
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions633
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)533
IBPoints failure (including no fault found)506