Driffield
30 delay minutes
Most of the delay picked up at Driffield in the four weeks to 9 December 2023 came from problems at stations.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 30 | 100% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RA | Station Buildings and Facilities (incl Platforms) | 30 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 160 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 114 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 63 |
| FF | FOC Diagramming or Rostering issue | 54 |
| FW | Late start/yard overtime not explained by Operator | 41 |
| OU | Delays not Investigated by Network Rail | 30 |
| RA | Station Buildings and Facilities (incl Platforms) | 30 |
| M8 | Technical failures above the Solebar | 24 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 17 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 15 |