Droitwich Spa
1,600 delay minutes
Most of the delay picked up at Droitwich Spa in the four weeks to 9 December 2023 came from signal, points and power faults.
28% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 32 | 2% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 984 | 62% | 16% | 35 a day, the most in 5 years | 1 |
| Weather and structures | 58 | 4% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 94 | 6% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 17 | 1% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 105 | 7% | 17% | 4 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 78 | 5% | 16% | 3 a day, the least in 5 years | - |
| Traincrew | 167 | 10% | 11% | 6 a day, the most in 5 years | - |
| Stations | 39 | 2% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 6 | <1% | 5% | 0 a day, the most in 5 years | - |
| Operator, other | 22 | 1% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 782 |
| TG | Driver | 138 |
| II | Signalling lineside cable fault | 104 |
| QJ | Special working for leaf-fall track circuit operation | 67 |
| IA | Signal failure (including no fault found) | 56 |
| MD | Technical failures below the solebar | 38 |
| ZY | Univestigated station overtime System Roll-up Only | 36 |
| JK | Flooding not due to exceptional weather | 34 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 27 |
| M8 | Technical failures above the Solebar | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,314 |
| IB | Points failure (including no fault found) | 3,297 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,804 |
| ZY | Univestigated station overtime System Roll-up Only | 2,123 |
| MD | Technical failures below the solebar | 2,077 |
| IA | Signal failure (including no fault found) | 1,887 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,510 |
| IC | Track circuit failure (including no fault found) | 1,505 |
| TH | (Senior) Conductor/Train Manager | 1,315 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,246 |