2,550 delay minutes

The biggest share (24%) of the delay picked up at Dover Priory in the four weeks to 9 December 2023 came from other operator causes.

68% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track351%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power1466%16% 5 a day, the least in 5 years-
Weather and structures41716%7% 15 a day, more than 2 of the other 4 years8
Autumn58023%7% 21 a day, the most in 5 years-
External21<1%4% 1 a day, the least in 5 years-
Network management32113%17% 11 a day, more than 3 of the other 4 years12
The operators' causes
Train faults2068%16% 7 a day, more than 3 of the other 4 years1
Traincrew1265%11% 5 a day, the most in 5 years-
Stations19<1%3% 1 a day, more than 1 of the other 4 years-
Operations622%5% 2 a day, the most in 5 years-
Operator, other61724%7% 22 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T561
TTLeaf fall Neutral543
OGIce on conductor rail/OHLE417
MNBrake and brake systems faults; including wheel flats where no other cause had been identified109
ICTrack circuit failure (including no fault found)104
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)87
TGDriver85
OCSignaller including mis-routing (not ERTM /ETCS related)71
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive54
VHPassenger Communication cord, door egress or emergency train alarm operated52
Since 2018
CodeWhat Network Rail loggedMinutes
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)9,263
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,134
TTLeaf fall Neutral2,982
Q3NZ Pumps T2,981
TGDriver2,843
ICTrack circuit failure (including no fault found)2,483
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)2,176
IHPower Supply And Distribution System Failure2,018
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,986
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,910