Leaves on the Line

Earlsfield

EAD Wessex route
CSV JSON

754 delay minutes

The biggest share (38%) of the delay picked up at Earlsfield in the four weeks to 9 December 2023 came from signal, points and power faults.

66% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track16221%8% 6 a day, the most in 5 years-
Signals, points and power28338%16% 10 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn4<1%7% 0 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management10414%17% 4 a day, more than 2 of the other 4 years-
The operators' causes
Train faults10514%16% 4 a day, more than 3 of the other 4 years2
Traincrew--11% 0 a day, the least in 5 years-
Stations7610%3% 3 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other213%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)277
IRBroken/cracked/twisted/buckled/flawed rail141
MNBrake and brake systems faults; including wheel flats where no other cause had been identified98
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)68
RYMishap - Station Operating causes35
R8Delay at Station believed to be operator cause and information required from operator (Ops Responsibility)24
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.21
OCSignaller including mis-routing (not ERTM /ETCS related)19
T2Delay at unstaffed station to non-DOO train17
I5Possession over-run from planned work9
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,139
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,537
T2Delay at unstaffed station to non-DOO train1,450
MDTechnical failures below the solebar1,443
ICTrack circuit failure (including no fault found)1,323
TGDriver1,319
IBPoints failure (including no fault found)1,169
VHPassenger Communication cord, door egress or emergency train alarm operated1,129
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,090
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.907