Eaglescliffe
923 delay minutes
The biggest share (17%) of the delay picked up at Eaglescliffe in the four weeks to 9 December 2023 came from signal, points and power faults.
77% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 48 | 5% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 155 | 17% | 16% | 6 a day, more than 3 of the other 4 years | - |
| Weather and structures | 155 | 17% | 7% | 6 a day, the most in 5 years | - |
| Autumn | 29 | 3% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 20 | 2% | 4% | 1 a day, the least in 5 years | - |
| Network management | 144 | 16% | 17% | 5 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 144 | 16% | 16% | 5 a day, more than 2 of the other 4 years | - |
| Traincrew | 93 | 10% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 60 | 7% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 55 | 6% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 22 | 2% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 111 |
| MC | Diesel Loco failure, defect, attention | 71 |
| OU | Delays not Investigated by Network Rail | 62 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 55 |
| TG | Driver | 46 |
| RB | Passengers joining/alighting | 45 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 40 |
| TH | (Senior) Conductor/Train Manager | 35 |
| II | Signalling lineside cable fault | 30 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,052 |
| MD | Technical failures below the solebar | 1,873 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,836 |
| IB | Points failure (including no fault found) | 1,791 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,311 |
| IC | Track circuit failure (including no fault found) | 1,256 |
| MC | Diesel Loco failure, defect, attention | 1,238 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,114 |
| M8 | Technical failures above the Solebar | 1,040 |
| JB | Reactionary Delay to 'P' coded TSRs | 962 |