Ealing Broadway
373 delay minutes
The biggest share (39%) of the delay picked up at Ealing Broadway in the four weeks to 9 December 2023 came from faulty trains.
53% of these minutes were knock-on from something that happened elsewhere first. 70% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 25 | 7% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 40 | 11% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 3 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 84 | 23% | 17% | 3 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 146 | 39% | 16% | 5 a day, more than 1 of the other 4 years | - |
| Traincrew | 27 | 7% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 31 | 8% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 14 | 4% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M2 | Delay due to ATO / ETCS equipment | 133 |
| I1 | Overhead line/third rail defect | 36 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 34 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 31 |
| OU | Delays not Investigated by Network Rail | 28 |
| TG | Driver | 27 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 14 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 11 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 6 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 1,878 |
| M2 | Delay due to ATO / ETCS equipment | 1,405 |
| TG | Driver | 1,371 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 1,168 |
| I1 | Overhead line/third rail defect | 1,162 |
| IC | Track circuit failure (including no fault found) | 1,015 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 999 |
| M7 | Door and Door system faults | 900 |
| M8 | Technical failures above the Solebar | 848 |
| QM | Train schedule/STP Process including erroneous simplifiers | 817 |