Leaves on the Line

Edenbridge

EBR Kent route
CSV JSON

0 delay minutes

No delay was picked up at Edenbridge in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards89
I7Engineer's train late into, from or failed in possession54
RMWaiting connections from other transport modes51
I6Delays as a result of line blocks / track patrols (including late handback)44
TGDriver40
OZOther Network Rail operating causes34
JTPoints failure caused by snow or frost where heaters are not fitted33
J0Telecom equipment radio failure (GSM-R)32
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)29
ICTrack circuit failure (including no fault found)26