The biggest share (29%) of the delay picked up at Effingham Junction in the four weeks to 9 December 2023 came from how the network was run.

62% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track82%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power62%16% 0 a day, the least in 5 years1
Weather and structures--7% 0 a day, the least in 5 years-
Autumn9127%7% 3 a day, more than 3 of the other 4 years-
External52%4% 0 a day, more than 3 of the other 4 years-
Network management9529%17% 3 a day, more than 1 of the other 4 years-
The operators' causes
Train faults227%16% 1 a day, more than 1 of the other 4 years-
Traincrew72%11% 0 a day, more than 1 of the other 4 years-
Stations258%3% 1 a day, more than 1 of the other 4 years-
Operations82%5% 0 a day, more than 2 of the other 4 years-
Operator, other6620%7% 2 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T61
TTLeaf fall Neutral61
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)56
QHAdhesion problems due to leaf contamination23
OCSignaller including mis-routing (not ERTM /ETCS related)18
I5Possession over-run from planned work14
MDTechnical failures below the solebar11
R5Station staff error - e.g wrong announcements misdirection8
RDAttaching/detaching/shunter/watering8
RYMishap - Station Operating causes8
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,078
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,467
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,109
ICTrack circuit failure (including no fault found)1,027
OCSignaller including mis-routing (not ERTM /ETCS related)968
TGDriver967
TTLeaf fall Neutral872
T2Delay at unstaffed station to non-DOO train705
MDTechnical failures below the solebar570
QAWTT schedule and or LTP Process including erroneous simplifiers564