Eggesford
893 delay minutes
The biggest share (26%) of the delay picked up at Eggesford in the four weeks to 9 December 2023 came from autumn leaves.
76% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 11 | 1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 161 | 18% | 16% | 6 a day, more than 3 of the other 4 years | - |
| Weather and structures | 4 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 236 | 26% | 7% | 8 a day, the most in 5 years | - |
| External | 14 | 2% | 4% | 1 a day, the least in 5 years | - |
| Network management | 175 | 20% | 17% | 6 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 119 | 13% | 16% | 4 a day, the least in 5 years | - |
| Traincrew | 24 | 3% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 7 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 33 | 4% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 110 | 12% | 7% | 4 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 126 |
| Q3 | NZ Pumps T | 110 |
| TT | Leaf fall Neutral | 110 |
| OU | Delays not Investigated by Network Rail | 93 |
| MD | Technical failures below the solebar | 68 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 45 |
| IC | Track circuit failure (including no fault found) | 29 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 29 |
| TZ | Other Passenger Train Operating Company causes | 27 |
| ZU | No Cause Identified After investigation by both Parties | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,470 |
| MD | Technical failures below the solebar | 2,263 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,149 |
| ZU | No Cause Identified After investigation by both Parties | 1,610 |
| TG | Driver | 1,489 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 1,451 |
| IB | Points failure (including no fault found) | 1,241 |
| RB | Passengers joining/alighting | 1,021 |
| Q3 | NZ Pumps T | 970 |
| TT | Leaf fall Neutral | 949 |