133 delay minutes

The biggest share (29%) of the delay picked up at Elmers End in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.

60% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track32%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power75%16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn118%7% 0 a day, more than 1 of the other 4 years-
External3929%4% 1 a day, the most in 5 years3
Network management118%17% 0 a day, the least in 5 years2
The operators' causes
Train faults--16% 0 a day, the least in 5 years2
Traincrew2922%11% 1 a day, more than 2 of the other 4 years-
Stations43%3% 0 a day, more than 3 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other2922%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XPBRIDGE HIT39
TGDriver29
VHPassenger Communication cord, door egress or emergency train alarm operated18
Q3NZ Pumps T11
OBDelayed by signaller not applying applicable regulating policy6
MPRail / wheel interface, adhesion problems (including ice on the running rail)6
TTLeaf fall Neutral6
IKTelecom equipment failure (including no fault found)4
RCre-booked assistance for a person with reduced mobility joining/alighting,4
IISignalling lineside cable fault3
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,285
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,350
ICTrack circuit failure (including no fault found)982
VHPassenger Communication cord, door egress or emergency train alarm operated883
OCSignaller including mis-routing (not ERTM /ETCS related)537
TGDriver490
M7Door and Door system faults427
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)417
TTLeaf fall Neutral327
I1Overhead line/third rail defect323