Elmers End
133 delay minutes
The biggest share (29%) of the delay picked up at Elmers End in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
60% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | 2% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 7 | 5% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 11 | 8% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | 39 | 29% | 4% | 1 a day, the most in 5 years | 3 |
| Network management | 11 | 8% | 17% | 0 a day, the least in 5 years | 2 |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | 2 |
| Traincrew | 29 | 22% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 4 | 3% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 29 | 22% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 39 |
| TG | Driver | 29 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 18 |
| Q3 | NZ Pumps T | 11 |
| OB | Delayed by signaller not applying applicable regulating policy | 6 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 6 |
| TT | Leaf fall Neutral | 6 |
| IK | Telecom equipment failure (including no fault found) | 4 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 4 |
| II | Signalling lineside cable fault | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,285 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,350 |
| IC | Track circuit failure (including no fault found) | 982 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 883 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 537 |
| TG | Driver | 490 |
| M7 | Door and Door system faults | 427 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 417 |
| TT | Leaf fall Neutral | 327 |
| I1 | Overhead line/third rail defect | 323 |