591 delay minutes

The biggest share (44%) of the delay picked up at Ellesmere Port in the four weeks to 9 December 2023 came from faulty trains.

69% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track71%8% 0 a day, the most in 5 years-
Signals, points and power10217%16% 4 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn376%7% 1 a day, more than 3 of the other 4 years-
External142%4% 1 a day, the most in 5 years5
Network management519%17% 2 a day, more than 1 of the other 4 years3
The operators' causes
Train faults26144%16% 9 a day, the most in 5 years9
Traincrew9115%11% 3 a day, the most in 5 years6
Stations--3% 0 a day, the least in 5 years-
Operations71%5% 0 a day, the least in 5 years-
Operator, other234%7% 1 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar104
IASignal failure (including no fault found)102
M7Door and Door system faults61
TGDriver56
M8Technical failures above the Solebar55
TH(Senior) Conductor/Train Manager35
Q3NZ Pumps T34
OMTechnical failure associated with a Railhead conditioning train28
TTLeaf fall Neutral23
MNBrake and brake systems faults; including wheel flats where no other cause had been identified17
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,166
MDTechnical failures below the solebar1,008
TH(Senior) Conductor/Train Manager921
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)759
TGDriver723
ZUNo Cause Identified After investigation by both Parties650
IASignal failure (including no fault found)602
ICTrack circuit failure (including no fault found)477
IKTelecom equipment failure (including no fault found)374
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure359