Ellesmere Port
591 delay minutes
The biggest share (44%) of the delay picked up at Ellesmere Port in the four weeks to 9 December 2023 came from faulty trains.
69% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 1% | 8% | 0 a day, the most in 5 years | - |
| Signals, points and power | 102 | 17% | 16% | 4 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 37 | 6% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 14 | 2% | 4% | 1 a day, the most in 5 years | 5 |
| Network management | 51 | 9% | 17% | 2 a day, more than 1 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 261 | 44% | 16% | 9 a day, the most in 5 years | 9 |
| Traincrew | 91 | 15% | 11% | 3 a day, the most in 5 years | 6 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 7 | 1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 23 | 4% | 7% | 1 a day, more than 2 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 104 |
| IA | Signal failure (including no fault found) | 102 |
| M7 | Door and Door system faults | 61 |
| TG | Driver | 56 |
| M8 | Technical failures above the Solebar | 55 |
| TH | (Senior) Conductor/Train Manager | 35 |
| Q3 | NZ Pumps T | 34 |
| OM | Technical failure associated with a Railhead conditioning train | 28 |
| TT | Leaf fall Neutral | 23 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,166 |
| MD | Technical failures below the solebar | 1,008 |
| TH | (Senior) Conductor/Train Manager | 921 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 759 |
| TG | Driver | 723 |
| ZU | No Cause Identified After investigation by both Parties | 650 |
| IA | Signal failure (including no fault found) | 602 |
| IC | Track circuit failure (including no fault found) | 477 |
| IK | Telecom equipment failure (including no fault found) | 374 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 359 |