Eltham
668 delay minutes
The biggest share (24%) of the delay picked up at Eltham in the four weeks to 9 December 2023 came from how the network was run.
89% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 45 | 7% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 43 | 6% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 97 | 15% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 6 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 162 | 24% | 17% | 6 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 135 | 20% | 16% | 5 a day, the most in 5 years | - |
| Traincrew | 43 | 6% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 137 | 21% | 7% | 5 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 97 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 94 |
| TT | Leaf fall Neutral | 94 |
| M8 | Technical failures above the Solebar | 73 |
| TG | Driver | 43 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 38 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 30 |
| OB | Delayed by signaller not applying applicable regulating policy | 30 |
| II | Signalling lineside cable fault | 24 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,881 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 3,024 |
| IC | Track circuit failure (including no fault found) | 1,723 |
| IB | Points failure (including no fault found) | 1,561 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,500 |
| TG | Driver | 1,420 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,009 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 910 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 809 |
| M7 | Door and Door system faults | 805 |