Leaves on the Line

Eltham

ELW Kent route
CSV JSON

668 delay minutes

The biggest share (24%) of the delay picked up at Eltham in the four weeks to 9 December 2023 came from how the network was run.

89% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track457%8% 2 a day, more than 3 of the other 4 years-
Signals, points and power436%16% 2 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn9715%7% 3 a day, more than 3 of the other 4 years-
External6<1%4% 0 a day, more than 1 of the other 4 years-
Network management16224%17% 6 a day, more than 3 of the other 4 years-
The operators' causes
Train faults13520%16% 5 a day, the most in 5 years-
Traincrew436%11% 2 a day, more than 3 of the other 4 years-
Stations--3% 0 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other13721%7% 5 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T97
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)94
TTLeaf fall Neutral94
M8Technical failures above the Solebar73
TGDriver43
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.38
MNBrake and brake systems faults; including wheel flats where no other cause had been identified30
OBDelayed by signaller not applying applicable regulating policy30
IISignalling lineside cable fault24
VHPassenger Communication cord, door egress or emergency train alarm operated24
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,881
VHPassenger Communication cord, door egress or emergency train alarm operated3,024
ICTrack circuit failure (including no fault found)1,723
IBPoints failure (including no fault found)1,561
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,500
TGDriver1,420
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,009
MNBrake and brake systems faults; including wheel flats where no other cause had been identified910
OCSignaller including mis-routing (not ERTM /ETCS related)809
M7Door and Door system faults805