Ely
1,693 delay minutes
The biggest share (26%) of the delay picked up at Ely in the four weeks to 9 December 2023 came from signal, points and power faults.
64% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 186 | 11% | 8% | 7 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 436 | 26% | 16% | 16 a day, more than 3 of the other 4 years | 2 |
| Weather and structures | 42 | 2% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 65 | 4% | 7% | 2 a day, more than 3 of the other 4 years | 1 |
| External | 67 | 4% | 4% | 2 a day, more than 1 of the other 4 years | 2 |
| Network management | 401 | 24% | 17% | 14 a day, the most in 5 years | 8 |
| The operators' causes | |||||
| Train faults | 255 | 15% | 16% | 9 a day, more than 3 of the other 4 years | 6 |
| Traincrew | 53 | 3% | 11% | 2 a day, the least in 5 years | 1 |
| Stations | 46 | 3% | 3% | 2 a day, the most in 5 years | - |
| Operations | 35 | 2% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 109 | 6% | 7% | 4 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 167 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 152 |
| M8 | Technical failures above the Solebar | 123 |
| IC | Track circuit failure (including no fault found) | 110 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 105 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 69 |
| IK | Telecom equipment failure (including no fault found) | 62 |
| QJ | Special working for leaf-fall track circuit operation | 62 |
| FW | Late start/yard overtime not explained by Operator | 52 |
| MD | Technical failures below the solebar | 50 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 19,549 |
| TG | Driver | 5,386 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,437 |
| IC | Track circuit failure (including no fault found) | 3,382 |
| I1 | Overhead line/third rail defect | 2,974 |
| IB | Points failure (including no fault found) | 2,812 |
| M8 | Technical failures above the Solebar | 2,586 |
| MD | Technical failures below the solebar | 2,532 |
| MC | Diesel Loco failure, defect, attention | 2,188 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 2,073 |