Enfield Town
83 delay minutes
The biggest share (39%) of the delay picked up at Enfield Town in the four weeks to 9 December 2023 came from how the network was run.
61% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 5 | 6% | 16% | 3 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | 4 | 5% | 4% | 7 |
| Network management | 32 | 39% | 17% | - |
| The operators' causes | ||||
| Train faults | 18 | 22% | 16% | 4 |
| Traincrew | 14 | 17% | 11% | 6 |
| Stations | 2 | 2% | 3% | - |
| Operations | 8 | 10% | 5% | 1 |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I5 | Possession over-run from planned work | 20 |
| TG | Driver | 14 |
| MU | Depot operating problem | 11 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 8 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 7 |
| I2 | AC/DC trip (including no fault or cause found) | 5 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 4 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 4 |
| XP | BRIDGE HIT | 4 |
| M8 | Technical failures above the Solebar | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 694 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 460 |
| MD | Technical failures below the solebar | 402 |
| M8 | Technical failures above the Solebar | 324 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 275 |
| M7 | Door and Door system faults | 266 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 254 |
| IB | Points failure (including no fault found) | 237 |
| I1 | Overhead line/third rail defect | 189 |
| IH | Power Supply And Distribution System Failure | 188 |