Elephant & Castle
0 delay minutes
No delay was picked up at Elephant & Castle in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | 3 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 3 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | 7 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I1 | Overhead line/third rail defect | 102 |
| IC | Track circuit failure (including no fault found) | 45 |
| IB | Points failure (including no fault found) | 44 |
| TG | Driver | 32 |
| M8 | Technical failures above the Solebar | 28 |
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 28 |
| XI | Security alert affecting the Network Rail network (incl. line blocks for emergency services attending off network incidents) | 24 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 23 |
| T3 | Waiting connections from other transport modes | 14 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 13 |