865 delay minutes

The biggest share (31%) of the delay picked up at Epsom in the four weeks to 9 December 2023 came from how the network was run.

63% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track121%8% 0 a day, more than 1 of the other 4 years1
Signals, points and power21325%16% 8 a day, more than 2 of the other 4 years5
Weather and structures--7% 0 a day, the least in 5 years-
Autumn546%7% 2 a day, more than 2 of the other 4 years-
External4<1%4% 0 a day, the least in 5 years11
Network management27131%17% 10 a day, more than 2 of the other 4 years3
The operators' causes
Train faults8410%16% 3 a day, more than 1 of the other 4 years2
Traincrew8810%11% 3 a day, the least in 5 years1
Stations395%3% 1 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years1
Operator, other10112%7% 4 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OCSignaller including mis-routing (not ERTM /ETCS related)89
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)81
TGDriver55
Q3NZ Pumps T51
TTLeaf fall Neutral51
I1Overhead line/third rail defect47
VHPassenger Communication cord, door egress or emergency train alarm operated42
MDTechnical failures below the solebar41
IASignal failure (including no fault found)30
IBPoints failure (including no fault found)30
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver8,363
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)7,390
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,424
IBPoints failure (including no fault found)2,556
OCSignaller including mis-routing (not ERTM /ETCS related)2,449
VHPassenger Communication cord, door egress or emergency train alarm operated2,271
M8Technical failures above the Solebar2,146
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,137
ICTrack circuit failure (including no fault found)1,911
MDTechnical failures below the solebar1,782