Epsom
865 delay minutes
The biggest share (31%) of the delay picked up at Epsom in the four weeks to 9 December 2023 came from how the network was run.
63% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 12 | 1% | 8% | 0 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 213 | 25% | 16% | 8 a day, more than 2 of the other 4 years | 5 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 54 | 6% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 4 | <1% | 4% | 0 a day, the least in 5 years | 11 |
| Network management | 271 | 31% | 17% | 10 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 84 | 10% | 16% | 3 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 88 | 10% | 11% | 3 a day, the least in 5 years | 1 |
| Stations | 39 | 5% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | 1 |
| Operator, other | 101 | 12% | 7% | 4 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 89 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 81 |
| TG | Driver | 55 |
| Q3 | NZ Pumps T | 51 |
| TT | Leaf fall Neutral | 51 |
| I1 | Overhead line/third rail defect | 47 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 42 |
| MD | Technical failures below the solebar | 41 |
| IA | Signal failure (including no fault found) | 30 |
| IB | Points failure (including no fault found) | 30 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 8,363 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 7,390 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,424 |
| IB | Points failure (including no fault found) | 2,556 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,449 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 2,271 |
| M8 | Technical failures above the Solebar | 2,146 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,137 |
| IC | Track circuit failure (including no fault found) | 1,911 |
| MD | Technical failures below the solebar | 1,782 |