Leaves on the Line

Earlestown

ERL North West route
CSV JSON

1,682 delay minutes

The biggest share (16%) of the delay picked up at Earlestown in the four weeks to 9 December 2023 came from faulty trains.

68% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track402%8% 1 a day, the least in 5 years-
Signals, points and power1388%16% 5 a day, more than 2 of the other 4 years-
Weather and structures24615%7% 9 a day, more than 3 of the other 4 years-
Autumn25215%7% 9 a day, the most in 5 years-
External362%4% 1 a day, more than 2 of the other 4 years-
Network management20312%17% 7 a day, more than 2 of the other 4 years1
The operators' causes
Train faults26416%16% 9 a day, more than 2 of the other 4 years-
Traincrew16910%11% 6 a day, more than 1 of the other 4 years-
Stations704%3% 3 a day, more than 2 of the other 4 years-
Operations503%5% 2 a day, the least in 5 years-
Operator, other21513%7% 8 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail173
Q3NZ Pumps T172
TTLeaf fall Neutral152
MNBrake and brake systems faults; including wheel flats where no other cause had been identified86
TGDriver85
TH(Senior) Conductor/Train Manager71
OUDelays not Investigated by Network Rail63
MPRail / wheel interface, adhesion problems (including ice on the running rail)48
QICautioning due to railhead leaf contamination45
MDTechnical failures below the solebar44
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver5,616
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure3,670
MDTechnical failures below the solebar3,539
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,093
IRBroken/cracked/twisted/buckled/flawed rail2,430
TH(Senior) Conductor/Train Manager2,200
ZUNo Cause Identified After investigation by both Parties1,916
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,911
RBPassengers joining/alighting1,835
M7Door and Door system faults1,828