2,237 delay minutes

The biggest share (31%) of the delay picked up at Eastleigh in the four weeks to 9 December 2023 came from signal, points and power faults.

77% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1848%8% 7 a day, more than 3 of the other 4 years1
Signals, points and power68831%16% 25 a day, the most in 5 years6
Weather and structures291%7% 1 a day, more than 2 of the other 4 years-
Autumn1235%7% 4 a day, the most in 5 years-
External21<1%4% 1 a day, more than 1 of the other 4 years-
Network management46821%17% 17 a day, more than 3 of the other 4 years3
The operators' causes
Train faults25111%16% 9 a day, more than 1 of the other 4 years3
Traincrew994%11% 4 a day, the least in 5 years-
Stations1085%3% 4 a day, the most in 5 years-
Operations733%5% 3 a day, the most in 5 years1
Operator, other1949%7% 7 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IESignalling Functional Power Supply Failure315
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.142
MDTechnical failures below the solebar127
IBPoints failure (including no fault found)91
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)90
IISignalling lineside cable fault78
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)77
I4OHLE/third rail power supply failure or reduction76
Q3NZ Pumps T75
TTLeaf fall Neutral75
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.12,928
ICTrack circuit failure (including no fault found)4,370
IRBroken/cracked/twisted/buckled/flawed rail4,315
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,562
TGDriver2,736
MDTechnical failures below the solebar2,655
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,428
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,204
IBPoints failure (including no fault found)2,098
I5Possession over-run from planned work2,045