Eastleigh
2,237 delay minutes
The biggest share (31%) of the delay picked up at Eastleigh in the four weeks to 9 December 2023 came from signal, points and power faults.
77% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 184 | 8% | 8% | 7 a day, more than 3 of the other 4 years | 1 |
| Signals, points and power | 688 | 31% | 16% | 25 a day, the most in 5 years | 6 |
| Weather and structures | 29 | 1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 123 | 5% | 7% | 4 a day, the most in 5 years | - |
| External | 21 | <1% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 468 | 21% | 17% | 17 a day, more than 3 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 251 | 11% | 16% | 9 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 99 | 4% | 11% | 4 a day, the least in 5 years | - |
| Stations | 108 | 5% | 3% | 4 a day, the most in 5 years | - |
| Operations | 73 | 3% | 5% | 3 a day, the most in 5 years | 1 |
| Operator, other | 194 | 9% | 7% | 7 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IE | Signalling Functional Power Supply Failure | 315 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 142 |
| MD | Technical failures below the solebar | 127 |
| IB | Points failure (including no fault found) | 91 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 90 |
| II | Signalling lineside cable fault | 78 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 77 |
| I4 | OHLE/third rail power supply failure or reduction | 76 |
| Q3 | NZ Pumps T | 75 |
| TT | Leaf fall Neutral | 75 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 12,928 |
| IC | Track circuit failure (including no fault found) | 4,370 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 4,315 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,562 |
| TG | Driver | 2,736 |
| MD | Technical failures below the solebar | 2,655 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,428 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,204 |
| IB | Points failure (including no fault found) | 2,098 |
| I5 | Possession over-run from planned work | 2,045 |