63 delay minutes

The biggest share (26%) of the delay picked up at East Tilbury in the four weeks to 9 December 2023 came from other operator causes.

30% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power610%16%-
Weather and structures--7%-
Autumn34%7%-
External1321%4%-
Network management1219%17%-
The operators' causes
Train faults35%16%-
Traincrew711%11%-
Stations12%3%-
Operations23%5%-
Operator, other1726%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)11
VHPassenger Communication cord, door egress or emergency train alarm operated11
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)9
TGDriver7
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles6
XUSunlight on signal or dispatch equipment Where all responsible mitigation has been taken4
ACWaiting Train preparation or completion of TOPS list/RT39733
M8Technical failures above the Solebar3
MPRail / wheel interface, adhesion problems (including ice on the running rail)3
Q3NZ Pumps T3
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)244
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)214
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)210
XDLevel Crossing Incidents including misuse and emergency services being prioritised over rail services203
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.157
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail140
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles127
RBPassengers joining/alighting91
TGDriver80
VHPassenger Communication cord, door egress or emergency train alarm operated80