London Euston
14,622 delay minutes
The biggest share (28%) of the delay picked up at London Euston in the four weeks to 9 December 2023 came from signal, points and power faults.
75% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 226 | 2% | 8% | 8 a day, the least in 5 years | 1 |
| Signals, points and power | 4,104 | 28% | 16% | 147 a day, the most in 5 years | 104 |
| Weather and structures | 388 | 3% | 7% | 14 a day, more than 2 of the other 4 years | 9 |
| Autumn | 32 | <1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 136 | <1% | 4% | 5 a day, more than 2 of the other 4 years | 1 |
| Network management | 2,377 | 16% | 17% | 85 a day, the most in 5 years | 145 |
| The operators' causes | |||||
| Train faults | 3,251 | 22% | 16% | 116 a day, the most in 5 years | 73 |
| Traincrew | 2,789 | 19% | 11% | 100 a day, the most in 5 years | 255 |
| Stations | 277 | 2% | 3% | 10 a day, more than 3 of the other 4 years | - |
| Operations | 502 | 3% | 5% | 18 a day, the most in 5 years | 33 |
| Operator, other | 541 | 4% | 7% | 19 a day, more than 1 of the other 4 years | 4 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,527 |
| IH | Power Supply And Distribution System Failure | 1,955 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 941 |
| M8 | Technical failures above the Solebar | 873 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 821 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 644 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 618 |
| IB | Points failure (including no fault found) | 464 |
| MD | Technical failures below the solebar | 367 |
| II | Signalling lineside cable fault | 281 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 54,639 |
| I1 | Overhead line/third rail defect | 28,741 |
| IB | Points failure (including no fault found) | 23,207 |
| M8 | Technical failures above the Solebar | 22,983 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 18,522 |
| TH | (Senior) Conductor/Train Manager | 16,348 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 15,284 |
| MD | Technical failures below the solebar | 14,436 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 13,730 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 12,921 |