Evesham
806 delay minutes
The biggest share (30%) of the delay picked up at Evesham in the four weeks to 9 December 2023 came from signal, points and power faults.
47% of these minutes were knock-on from something that happened elsewhere first. 68% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 89 | 11% | 8% | 3 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 239 | 30% | 16% | 9 a day, the most in 5 years | - |
| Weather and structures | 224 | 28% | 7% | 8 a day, more than 3 of the other 4 years | - |
| Autumn | 5 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 8 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 90 | 11% | 17% | 3 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 92 | 11% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Traincrew | 35 | 4% | 11% | 1 a day, the most in 5 years | 1 |
| Stations | 13 | 2% | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 12 | 1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 205 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 75 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 72 |
| OU | Delays not Investigated by Network Rail | 60 |
| IB | Points failure (including no fault found) | 54 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 47 |
| TG | Driver | 32 |
| IA | Signal failure (including no fault found) | 30 |
| M8 | Technical failures above the Solebar | 29 |
| MD | Technical failures below the solebar | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,217 |
| MD | Technical failures below the solebar | 2,010 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,598 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 1,580 |
| TG | Driver | 1,167 |
| IB | Points failure (including no fault found) | 1,139 |
| ZU | No Cause Identified After investigation by both Parties | 1,133 |
| M7 | Door and Door system faults | 771 |
| IE | Signalling Functional Power Supply Failure | 745 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 722 |