Leaves on the Line

Ewell West

EWW Wessex route
CSV JSON

0 delay minutes

No delay was picked up at Ewell West in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,261
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure130
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)28
TATrain-crew/loco/stock/unit diagram issues17
VHPassenger Communication cord, door egress or emergency train alarm operated14
TH(Senior) Conductor/Train Manager12
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure7
OUDelays not Investigated by Network Rail4
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1