Exeter Central
1,142 delay minutes
The biggest share (26%) of the delay picked up at Exeter Central in the four weeks to 9 December 2023 came from how the network was run.
90% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 52 | 5% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 114 | 10% | 16% | 4 a day, more than 2 of the other 4 years | 4 |
| Weather and structures | 61 | 5% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 82 | 7% | 7% | 3 a day, the least in 5 years | 1 |
| External | 22 | 2% | 4% | 1 a day, more than 1 of the other 4 years | 1 |
| Network management | 295 | 26% | 17% | 11 a day, the most in 5 years | 26 |
| The operators' causes | |||||
| Train faults | 266 | 23% | 16% | 10 a day, more than 3 of the other 4 years | 5 |
| Traincrew | 95 | 8% | 11% | 3 a day, more than 3 of the other 4 years | 1 |
| Stations | 41 | 4% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 44 | 4% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 72 | 6% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I8 | Animal Strike or Incursion within the control of Network Rail | 107 |
| TG | Driver | 80 |
| MD | Technical failures below the solebar | 78 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 76 |
| ON | Delays not properly investigated by Network Rail | 62 |
| OU | Delays not Investigated by Network Rail | 56 |
| Q3 | NZ Pumps T | 52 |
| TT | Leaf fall Neutral | 52 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 46 |
| IC | Track circuit failure (including no fault found) | 44 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 3,145 |
| TG | Driver | 2,226 |
| M7 | Door and Door system faults | 1,800 |
| IC | Track circuit failure (including no fault found) | 1,585 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,454 |
| IB | Points failure (including no fault found) | 1,418 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,394 |
| M8 | Technical failures above the Solebar | 1,311 |
| R8 | Delay at Station believed to be operator cause and information required from operator (Ops Responsibility) | 1,178 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 929 |