4,140 delay minutes
The biggest share (28%) of the delay picked up at Exeter St Davids in the four weeks to 9 December 2023 came from signal, points and power faults.
71% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 445 | 11% | 8% | 16 a day, the most in 5 years | 1 |
| Signals, points and power | 1,148 | 28% | 16% | 41 a day, the most in 5 years | 16 |
| Weather and structures | 401 | 10% | 7% | 14 a day, more than 3 of the other 4 years | 42 |
| Autumn | 236 | 6% | 7% | 8 a day, the most in 5 years | 6 |
| External | 28 | <1% | 4% | 1 a day, the least in 5 years | 1 |
| Network management | 521 | 13% | 17% | 19 a day, more than 3 of the other 4 years | 191 |
| The operators' causes | |||||
| Train faults | 678 | 16% | 16% | 24 a day, more than 2 of the other 4 years | 13 |
| Traincrew | 478 | 12% | 11% | 17 a day, the most in 5 years | 34 |
| Stations | 32 | <1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 95 | 2% | 5% | 3 a day, the most in 5 years | 2 |
| Operator, other | 79 | 2% | 7% | 3 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 467 |
| TG | Driver | 415 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 225 |
| JK | Flooding not due to exceptional weather | 219 |
| OU | Delays not Investigated by Network Rail | 194 |
| IB | Points failure (including no fault found) | 193 |
| IC | Track circuit failure (including no fault found) | 188 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 168 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 152 |
| QI | Cautioning due to railhead leaf contamination | 124 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 13,063 |
| MD | Technical failures below the solebar | 10,624 |
| M8 | Technical failures above the Solebar | 6,525 |
| IC | Track circuit failure (including no fault found) | 5,198 |
| M7 | Door and Door system faults | 4,948 |
| IB | Points failure (including no fault found) | 4,866 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 4,290 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,685 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 3,649 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,409 |