624 delay minutes
The biggest share (31%) of the delay picked up at Exmouth in the four weeks to 9 December 2023 came from faulty trains.
84% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | <1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 50 | 8% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 41 | 7% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 49 | 8% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 161 | 26% | 17% | 6 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 193 | 31% | 16% | 7 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 54 | 9% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 7 | 1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 24 | 4% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 38 | 6% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 90 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 42 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 41 |
| TG | Driver | 38 |
| ON | Delays not properly investigated by Network Rail | 36 |
| Q3 | NZ Pumps T | 34 |
| TT | Leaf fall Neutral | 34 |
| MD | Technical failures below the solebar | 29 |
| M7 | Door and Door system faults | 26 |
| OU | Delays not Investigated by Network Rail | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 2,542 |
| M7 | Door and Door system faults | 1,899 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,658 |
| RB | Passengers joining/alighting | 1,565 |
| ZU | No Cause Identified After investigation by both Parties | 1,394 |
| TG | Driver | 1,372 |
| M8 | Technical failures above the Solebar | 1,175 |
| IC | Track circuit failure (including no fault found) | 1,040 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,036 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 850 |