Falmouth Docks
496 delay minutes
The biggest share (24%) of the delay picked up at Falmouth Docks in the four weeks to 9 December 2023 came from faulty trains.
81% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 53 | 11% | 8% | 2 a day, the most in 5 years | 2 |
| Signals, points and power | 92 | 19% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Weather and structures | 13 | 3% | 7% | 0 a day, more than 1 of the other 4 years | 3 |
| Autumn | 30 | 6% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 39 | 8% | 4% | 1 a day, the most in 5 years | 5 |
| Network management | 52 | 10% | 17% | 2 a day, more than 1 of the other 4 years | 8 |
| The operators' causes | |||||
| Train faults | 120 | 24% | 16% | 4 a day, more than 1 of the other 4 years | 16 |
| Traincrew | 46 | 9% | 11% | 2 a day, more than 3 of the other 4 years | 22 |
| Stations | 8 | 2% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 35 | 7% | 5% | 1 a day, the most in 5 years | 1 |
| Operator, other | 8 | 2% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 87 |
| IA | Signal failure (including no fault found) | 36 |
| OU | Delays not Investigated by Network Rail | 36 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 30 |
| TC | Delays from Traincrew/loco/stock/unit diagrams issues resulting from an agreed mitigation resource plan, at 22:00 the day prior | 29 |
| J3 | Axle Counter Failure | 25 |
| TG | Driver | 23 |
| TH | (Senior) Conductor/Train Manager | 23 |
| QI | Cautioning due to railhead leaf contamination | 22 |
| I9 | Fires starting on Network Rail Infrastructure | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,927 |
| MD | Technical failures below the solebar | 1,809 |
| IA | Signal failure (including no fault found) | 1,360 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,220 |
| IB | Points failure (including no fault found) | 1,160 |
| J3 | Axle Counter Failure | 1,064 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 854 |
| ZU | No Cause Identified After investigation by both Parties | 847 |
| M8 | Technical failures above the Solebar | 664 |
| IC | Track circuit failure (including no fault found) | 622 |