Leaves on the Line

Faversham

FAV Kent route
CSV JSON

2,072 delay minutes

The biggest share (19%) of the delay picked up at Faversham in the four weeks to 9 December 2023 came from signal, points and power faults.

52% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track241%8% 1 a day, the least in 5 years-
Signals, points and power38619%16% 14 a day, the most in 5 years1
Weather and structures32416%7% 12 a day, the most in 5 years1
Autumn23711%7% 8 a day, more than 3 of the other 4 years-
External6<1%4% 0 a day, the least in 5 years-
Network management31715%17% 11 a day, more than 2 of the other 4 years34
The operators' causes
Train faults22711%16% 8 a day, more than 3 of the other 4 years2
Traincrew1467%11% 5 a day, the most in 5 years1
Stations432%3% 2 a day, more than 1 of the other 4 years-
Operations945%5% 3 a day, the most in 5 years-
Operator, other26813%7% 10 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect349
OGIce on conductor rail/OHLE324
Q3NZ Pumps T213
TTLeaf fall Neutral150
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)129
OCSignaller including mis-routing (not ERTM /ETCS related)82
TGDriver70
MPRail / wheel interface, adhesion problems (including ice on the running rail)63
MYCoupler, Coupler system and Jumper cable faults62
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps61
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)7,171
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,429
TGDriver4,142
XPBRIDGE HIT3,236
IBPoints failure (including no fault found)2,944
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)2,326
J3Axle Counter Failure2,285
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail2,161
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,932
OCSignaller including mis-routing (not ERTM /ETCS related)1,900