Faversham
2,072 delay minutes
The biggest share (19%) of the delay picked up at Faversham in the four weeks to 9 December 2023 came from signal, points and power faults.
52% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 24 | 1% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 386 | 19% | 16% | 14 a day, the most in 5 years | 1 |
| Weather and structures | 324 | 16% | 7% | 12 a day, the most in 5 years | 1 |
| Autumn | 237 | 11% | 7% | 8 a day, more than 3 of the other 4 years | - |
| External | 6 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 317 | 15% | 17% | 11 a day, more than 2 of the other 4 years | 34 |
| The operators' causes | |||||
| Train faults | 227 | 11% | 16% | 8 a day, more than 3 of the other 4 years | 2 |
| Traincrew | 146 | 7% | 11% | 5 a day, the most in 5 years | 1 |
| Stations | 43 | 2% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 94 | 5% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | 268 | 13% | 7% | 10 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I1 | Overhead line/third rail defect | 349 |
| OG | Ice on conductor rail/OHLE | 324 |
| Q3 | NZ Pumps T | 213 |
| TT | Leaf fall Neutral | 150 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 129 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 82 |
| TG | Driver | 70 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 63 |
| MY | Coupler, Coupler system and Jumper cable faults | 62 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 61 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 7,171 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,429 |
| TG | Driver | 4,142 |
| XP | BRIDGE HIT | 3,236 |
| IB | Points failure (including no fault found) | 2,944 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 2,326 |
| J3 | Axle Counter Failure | 2,285 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 2,161 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,932 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,900 |