871 delay minutes

The biggest share (31%) of the delay picked up at Feltham in the four weeks to 9 December 2023 came from signal, points and power faults.

53% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track172%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power26931%16% 10 a day, the most in 5 years-
Weather and structures3<1%7% 0 a day, more than 2 of the other 4 years-
Autumn283%7% 1 a day, more than 3 of the other 4 years-
External688%4% 2 a day, the most in 5 years-
Network management15818%17% 6 a day, more than 3 of the other 4 years-
The operators' causes
Train faults8610%16% 3 a day, the most in 5 years-
Traincrew789%11% 3 a day, more than 3 of the other 4 years-
Stations718%3% 3 a day, the most in 5 years-
Operations344%5% 1 a day, the most in 5 years-
Operator, other607%7% 2 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IJAWS/ATP/TPWS/Train stop/On track equipment failure154
XPBRIDGE HIT68
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure57
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)54
J3Axle Counter Failure48
M7Door and Door system faults48
TGDriver45
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)45
T2Delay at unstaffed station to non-DOO train36
TH(Senior) Conductor/Train Manager30
Since 2018
CodeWhat Network Rail loggedMinutes
VHPassenger Communication cord, door egress or emergency train alarm operated2,491
ICTrack circuit failure (including no fault found)2,261
TGDriver1,995
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,939
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,601
IRBroken/cracked/twisted/buckled/flawed rail1,171
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.945
TH(Senior) Conductor/Train Manager916
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)852
OCSignaller including mis-routing (not ERTM /ETCS related)827