Filton Abbey Wood
1,862 delay minutes
The biggest share (24%) of the delay picked up at Filton Abbey Wood in the four weeks to 9 December 2023 came from faulty trains.
88% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 175 | 9% | 8% | 6 a day, the most in 5 years | - |
| Signals, points and power | 241 | 13% | 16% | 9 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 170 | 9% | 7% | 6 a day, the most in 5 years | 8 |
| Autumn | 77 | 4% | 7% | 3 a day, the most in 5 years | - |
| External | 33 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 330 | 18% | 17% | 12 a day, more than 3 of the other 4 years | 38 |
| The operators' causes | |||||
| Train faults | 456 | 24% | 16% | 16 a day, the most in 5 years | 44 |
| Traincrew | 212 | 11% | 11% | 8 a day, the most in 5 years | 10 |
| Stations | 36 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 69 | 4% | 5% | 2 a day, the most in 5 years | 1 |
| Operator, other | 65 | 3% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 163 |
| IB | Points failure (including no fault found) | 134 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 126 |
| M8 | Technical failures above the Solebar | 102 |
| OU | Delays not Investigated by Network Rail | 101 |
| MD | Technical failures below the solebar | 83 |
| MC | Diesel Loco failure, defect, attention | 80 |
| JK | Flooding not due to exceptional weather | 77 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 68 |
| Q3 | NZ Pumps T | 44 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 3,650 |
| TG | Driver | 3,547 |
| J3 | Axle Counter Failure | 3,278 |
| MD | Technical failures below the solebar | 3,089 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,608 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,472 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 2,272 |
| M8 | Technical failures above the Solebar | 2,090 |
| M7 | Door and Door system faults | 2,084 |
| ZU | No Cause Identified After investigation by both Parties | 1,913 |