Folkestone Central

FKC Kent route
CSV JSON

98 delay minutes

The biggest share (47%) of the delay picked up at Folkestone Central in the four weeks to 9 December 2023 came from signal, points and power faults.

37% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power4647%16% 2 a day, more than 3 of the other 4 years1
Weather and structures--7% 0 a day, the least in 5 years-
Autumn--7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management1919%17% 1 a day, more than 2 of the other 4 years-
The operators' causes
Train faults44%16% 0 a day, more than 2 of the other 4 years-
Traincrew--11% 0 a day, the least in 5 years-
Stations66%3% 0 a day, more than 1 of the other 4 years-
Operations2323%5% 1 a day, the most in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)31
IASignal failure (including no fault found)15
OCSignaller including mis-routing (not ERTM /ETCS related)11
TZOther Passenger Train Operating Company causes8
TATrain-crew/loco/stock/unit diagram issues6
TNLate presentation from the continent6
MNBrake and brake systems faults; including wheel flats where no other cause had been identified4
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident4
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4
RCre-booked assistance for a person with reduced mobility joining/alighting,3
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,207
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)569
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.496
ICTrack circuit failure (including no fault found)425
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)401
IRBroken/cracked/twisted/buckled/flawed rail328
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions298
OCSignaller including mis-routing (not ERTM /ETCS related)272
IHPower Supply And Distribution System Failure198
VHPassenger Communication cord, door egress or emergency train alarm operated181