Flitwick
1,450 delay minutes
The biggest share (28%) of the delay picked up at Flitwick in the four weeks to 9 December 2023 came from how the network was run.
79% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 164 | 11% | 8% | 6 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 220 | 15% | 16% | 8 a day, more than 1 of the other 4 years | - |
| Weather and structures | 57 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 38 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 22 | 2% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 403 | 28% | 17% | 14 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 205 | 14% | 16% | 7 a day, more than 2 of the other 4 years | - |
| Traincrew | 219 | 15% | 11% | 8 a day, the most in 5 years | 1 |
| Stations | 8 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 27 | 2% | 5% | 1 a day, the least in 5 years | - |
| Operator, other | 87 | 6% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 176 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 111 |
| IB | Points failure (including no fault found) | 100 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 94 |
| M8 | Technical failures above the Solebar | 73 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 55 |
| I5 | Possession over-run from planned work | 42 |
| JB | Reactionary Delay to 'P' coded TSRs | 37 |
| IC | Track circuit failure (including no fault found) | 35 |
| TI | Traincrew rostering problem | 35 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 7,992 |
| M8 | Technical failures above the Solebar | 7,547 |
| IB | Points failure (including no fault found) | 3,750 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,679 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,086 |
| IC | Track circuit failure (including no fault found) | 2,674 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,609 |
| XP | BRIDGE HIT | 2,587 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,540 |
| QM | Train schedule/STP Process including erroneous simplifiers | 2,521 |