Felixstowe
281 delay minutes
The biggest share (23%) of the delay picked up at Felixstowe in the four weeks to 9 December 2023 came from other operator causes.
97% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | 1% | 8% | 0 a day, more than 3 of the other 4 years | 1 |
| Signals, points and power | 45 | 16% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 10 | 4% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 8 | 3% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 43 | 15% | 17% | 2 a day, more than 1 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 29 | 10% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 55 | 20% | 11% | 2 a day, the most in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 24 | 9% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 64 | 23% | 7% | 2 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 38 |
| TG | Driver | 38 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 32 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 16 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 15 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 15 |
| MU | Depot operating problem | 10 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 10 |
| FE | Train Crew not available including after rest | 9 |
| AZ | Other Freight Operating Company cause, to be specified (including congestion), in off Network Rail network terminals or yards | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| AC | Waiting Train preparation or completion of TOPS list/RT3973 | 1,083 |
| FW | Late start/yard overtime not explained by Operator | 841 |
| MC | Diesel Loco failure, defect, attention | 692 |
| MU | Depot operating problem | 651 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 600 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 431 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 409 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 387 |
| MD | Technical failures below the solebar | 368 |
| AE | Congestion in off Network Rail network Terminal or Yard | 352 |