281 delay minutes

The biggest share (23%) of the delay picked up at Felixstowe in the four weeks to 9 December 2023 came from other operator causes.

97% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track31%8% 0 a day, more than 3 of the other 4 years1
Signals, points and power4516%16% 2 a day, more than 3 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn104%7% 0 a day, more than 2 of the other 4 years-
External83%4% 0 a day, more than 3 of the other 4 years-
Network management4315%17% 2 a day, more than 1 of the other 4 years2
The operators' causes
Train faults2910%16% 1 a day, more than 1 of the other 4 years-
Traincrew5520%11% 2 a day, the most in 5 years-
Stations--3% 0 a day, the least in 5 years-
Operations249%5% 1 a day, more than 3 of the other 4 years-
Operator, other6423%7% 2 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ACWaiting Train preparation or completion of TOPS list/RT397338
TGDriver38
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure32
M0Confirmed train cab based safety system fault (including GSMR)16
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards15
OCSignaller including mis-routing (not ERTM /ETCS related)15
MUDepot operating problem10
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)10
FETrain Crew not available including after rest9
AZOther Freight Operating Company cause, to be specified (including congestion), in off Network Rail network terminals or yards8
Since 2018
CodeWhat Network Rail loggedMinutes
ACWaiting Train preparation or completion of TOPS list/RT39731,083
FWLate start/yard overtime not explained by Operator841
MCDiesel Loco failure, defect, attention692
MUDepot operating problem651
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.600
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)431
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles409
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure387
MDTechnical failures below the solebar368
AECongestion in off Network Rail network Terminal or Yard352