Farnborough (Main)

FNB Wessex route
CSV JSON

4,438 delay minutes

The biggest share (37%) of the delay picked up at Farnborough (Main) in the four weeks to 9 December 2023 came from signal, points and power faults.

47% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1864%8% 7 a day, more than 2 of the other 4 years-
Signals, points and power1,62737%16% 58 a day, more than 3 of the other 4 years2
Weather and structures75517%7% 27 a day, the most in 5 years9
Autumn47611%7% 17 a day, the most in 5 years-
External621%4% 2 a day, more than 1 of the other 4 years-
Network management51212%17% 18 a day, more than 2 of the other 4 years-
The operators' causes
Train faults2536%16% 9 a day, more than 1 of the other 4 years-
Traincrew1203%11% 4 a day, more than 2 of the other 4 years-
Stations541%3% 2 a day, more than 2 of the other 4 years-
Operations631%5% 2 a day, the most in 5 years-
Operator, other3317%7% 12 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)1,297
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)730
Q3NZ Pumps T281
TTLeaf fall Neutral281
OCSignaller including mis-routing (not ERTM /ETCS related)175
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.106
QICautioning due to railhead leaf contamination91
MDTechnical failures below the solebar89
IJAWS/ATP/TPWS/Train stop/On track equipment failure85
IISignalling lineside cable fault77
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)7,303
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,790
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure6,244
ICTrack circuit failure (including no fault found)4,240
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,155
OCSignaller including mis-routing (not ERTM /ETCS related)3,444
TGDriver3,082
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)2,796
MDTechnical failures below the solebar2,754
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions2,441