Farncombe
430 delay minutes
The biggest share (29%) of the delay picked up at Farncombe in the four weeks to 9 December 2023 came from signal, points and power faults.
64% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 6 | 1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 124 | 29% | 16% | 4 a day, more than 3 of the other 4 years | - |
| Weather and structures | 17 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 58 | 13% | 7% | 2 a day, more than 2 of the other 4 years | - |
| External | 9 | 2% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 50 | 12% | 17% | 2 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 55 | 13% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Traincrew | 32 | 7% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 11 | 3% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 8 | 2% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 60 | 14% | 7% | 2 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 70 |
| Q3 | NZ Pumps T | 56 |
| TT | Leaf fall Neutral | 56 |
| IB | Points failure (including no fault found) | 39 |
| MC | Diesel Loco failure, defect, attention | 24 |
| TH | (Senior) Conductor/Train Manager | 20 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 18 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 17 |
| MD | Technical failures below the solebar | 17 |
| II | Signalling lineside cable fault | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 7,317 |
| I4 | OHLE/third rail power supply failure or reduction | 3,441 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,892 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,857 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 986 |
| MD | Technical failures below the solebar | 907 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 850 |
| TG | Driver | 813 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 711 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 696 |