430 delay minutes

The biggest share (29%) of the delay picked up at Farncombe in the four weeks to 9 December 2023 came from signal, points and power faults.

64% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track61%8% 0 a day, the least in 5 years-
Signals, points and power12429%16% 4 a day, more than 3 of the other 4 years-
Weather and structures174%7% 1 a day, more than 2 of the other 4 years-
Autumn5813%7% 2 a day, more than 2 of the other 4 years-
External92%4% 0 a day, more than 2 of the other 4 years-
Network management5012%17% 2 a day, the least in 5 years-
The operators' causes
Train faults5513%16% 2 a day, more than 1 of the other 4 years-
Traincrew327%11% 1 a day, more than 2 of the other 4 years-
Stations113%3% 0 a day, more than 2 of the other 4 years-
Operations82%5% 0 a day, more than 2 of the other 4 years-
Operator, other6014%7% 2 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles70
Q3NZ Pumps T56
TTLeaf fall Neutral56
IBPoints failure (including no fault found)39
MCDiesel Loco failure, defect, attention24
TH(Senior) Conductor/Train Manager20
OCSignaller including mis-routing (not ERTM /ETCS related)18
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)17
MDTechnical failures below the solebar17
IISignalling lineside cable fault11
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)7,317
I4OHLE/third rail power supply failure or reduction3,441
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,892
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,857
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)986
MDTechnical failures below the solebar907
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure850
TGDriver813
OCSignaller including mis-routing (not ERTM /ETCS related)711
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles696