912 delay minutes

The biggest share (28%) of the delay picked up at Farnham in the four weeks to 9 December 2023 came from traincrew problems.

82% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track324%8% 1 a day, more than 2 of the other 4 years9
Signals, points and power18921%16% 7 a day, more than 3 of the other 4 years5
Weather and structures455%7% 2 a day, more than 3 of the other 4 years1
Autumn182%7% 1 a day, more than 2 of the other 4 years-
External465%4% 2 a day, the most in 5 years6
Network management11513%17% 4 a day, more than 1 of the other 4 years9
The operators' causes
Train faults16018%16% 6 a day, more than 3 of the other 4 years3
Traincrew25828%11% 9 a day, the most in 5 years19
Stations243%3% 1 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years1
Operator, other263%7% 1 a day, more than 1 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)173
TITraincrew rostering problem145
TGDriver104
MNBrake and brake systems faults; including wheel flats where no other cause had been identified56
OCSignaller including mis-routing (not ERTM /ETCS related)48
MUDepot operating problem35
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)33
MDTechnical failures below the solebar29
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)25
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)25
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.7,506
ICTrack circuit failure (including no fault found)2,694
TGDriver1,718
IBPoints failure (including no fault found)1,293
MDTechnical failures below the solebar1,152
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)1,045
TH(Senior) Conductor/Train Manager1,019
TITraincrew rostering problem844
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards748
M7Door and Door system faults737