Furness Vale
459 delay minutes
The biggest share (31%) of the delay picked up at Furness Vale in the four weeks to 9 December 2023 came from weather and structures.
19% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 86 | 19% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Weather and structures | 143 | 31% | 7% | 5 a day, the most in 5 years | - |
| Autumn | 90 | 19% | 7% | 3 a day, the most in 5 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 3 of the other 4 years | - |
| Network management | 90 | 20% | 17% | 3 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 9 | 2% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 11 | 2% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 17 | 4% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 11 | 2% | 7% | 0 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 122 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 82 |
| IA | Signal failure (including no fault found) | 46 |
| OU | Delays not Investigated by Network Rail | 25 |
| OM | Technical failure associated with a Railhead conditioning train | 23 |
| JK | Flooding not due to exceptional weather | 21 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 16 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 14 |
| IG | Block failure | 12 |
| TG | Driver | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,881 |
| MD | Technical failures below the solebar | 954 |
| IB | Points failure (including no fault found) | 865 |
| TG | Driver | 532 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 390 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 354 |
| M8 | Technical failures above the Solebar | 308 |
| IA | Signal failure (including no fault found) | 259 |
| M7 | Door and Door system faults | 250 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 244 |