Four Oaks
1,956 delay minutes
The biggest share (19%) of the delay picked up at Four Oaks in the four weeks to 9 December 2023 came from signal, points and power faults.
82% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 157 | 8% | 8% | 6 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 379 | 19% | 16% | 14 a day, the most in 5 years | - |
| Weather and structures | 67 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 140 | 7% | 7% | 5 a day, the most in 5 years | - |
| External | 95 | 5% | 4% | 3 a day, more than 2 of the other 4 years | 6 |
| Network management | 205 | 10% | 17% | 7 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 226 | 12% | 16% | 8 a day, more than 3 of the other 4 years | 9 |
| Traincrew | 186 | 10% | 11% | 7 a day, more than 2 of the other 4 years | - |
| Stations | 229 | 12% | 3% | 8 a day, the most in 5 years | - |
| Operations | 37 | 2% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 236 | 12% | 7% | 8 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 137 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 126 |
| Q3 | NZ Pumps T | 119 |
| TH | (Senior) Conductor/Train Manager | 101 |
| IB | Points failure (including no fault found) | 100 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 90 |
| TG | Driver | 81 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 80 |
| MD | Technical failures below the solebar | 80 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 77 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,918 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,350 |
| TH | (Senior) Conductor/Train Manager | 2,813 |
| MD | Technical failures below the solebar | 2,140 |
| ZU | No Cause Identified After investigation by both Parties | 2,045 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 2,001 |
| M8 | Technical failures above the Solebar | 1,721 |
| IB | Points failure (including no fault found) | 1,718 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,684 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,581 |