463 delay minutes

The biggest share (27%) of the delay picked up at London Fenchurch Street in the four weeks to 9 December 2023 came from how the network was run.

72% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track92%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power327%16% 1 a day, more than 1 of the other 4 years2
Weather and structures--7% 0 a day, the least in 5 years-
Autumn2<1%7% 0 a day, the least in 5 years-
External--4% 0 a day, the least in 5 years-
Network management12727%17% 5 a day, the most in 5 years12
The operators' causes
Train faults12727%16% 5 a day, more than 3 of the other 4 years8
Traincrew6314%11% 2 a day, more than 3 of the other 4 years6
Stations72%3% 0 a day, the least in 5 years-
Operations102%5% 0 a day, more than 3 of the other 4 years-
Operator, other8719%7% 3 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)103
VHPassenger Communication cord, door egress or emergency train alarm operated85
M8Technical failures above the Solebar75
TGDriver49
MDTechnical failures below the solebar24
FCFreight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change]14
J0Telecom equipment radio failure (GSM-R)14
MNBrake and brake systems faults; including wheel flats where no other cause had been identified10
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9
M9Reported fleet equipment defect - no fault found9
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver3,766
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.3,308
M8Technical failures above the Solebar1,621
XRCable vandalism or theft1,366
MDTechnical failures below the solebar1,334
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,315
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,224
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,210
IRBroken/cracked/twisted/buckled/flawed rail1,143
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)1,090