Fratton
2,176 delay minutes
The biggest share (26%) of the delay picked up at Fratton in the four weeks to 9 December 2023 came from signal, points and power faults.
61% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 530 | 24% | 8% | 19 a day, more than 3 of the other 4 years | 1 |
| Signals, points and power | 559 | 26% | 16% | 20 a day, more than 2 of the other 4 years | 24 |
| Weather and structures | 25 | 1% | 7% | 1 a day, more than 3 of the other 4 years | 4 |
| Autumn | 51 | 2% | 7% | 2 a day, more than 3 of the other 4 years | 1 |
| External | 223 | 10% | 4% | 8 a day, the most in 5 years | 12 |
| Network management | 280 | 13% | 17% | 10 a day, more than 2 of the other 4 years | 15 |
| The operators' causes | |||||
| Train faults | 270 | 12% | 16% | 10 a day, the most in 5 years | 8 |
| Traincrew | 123 | 6% | 11% | 4 a day, more than 1 of the other 4 years | 5 |
| Stations | 63 | 3% | 3% | 2 a day, the most in 5 years | 2 |
| Operations | 29 | 1% | 5% | 1 a day, the most in 5 years | 3 |
| Operator, other | 23 | 1% | 7% | 1 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 471 |
| IB | Points failure (including no fault found) | 414 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 186 |
| I5 | Possession over-run from planned work | 129 |
| II | Signalling lineside cable fault | 105 |
| TG | Driver | 77 |
| MY | Coupler, Coupler system and Jumper cable faults | 71 |
| MD | Technical failures below the solebar | 56 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 49 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 45 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 11,296 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,413 |
| TG | Driver | 4,946 |
| IB | Points failure (including no fault found) | 3,512 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,956 |
| J3 | Axle Counter Failure | 2,806 |
| MD | Technical failures below the solebar | 2,604 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,452 |
| TH | (Senior) Conductor/Train Manager | 2,176 |
| IC | Track circuit failure (including no fault found) | 2,053 |