Gilberdyke
3,064 delay minutes
The biggest share (45%) of the delay picked up at Gilberdyke in the four weeks to 9 December 2023 came from autumn leaves.
60% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 39 | 1% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 508 | 17% | 16% | 18 a day, the most in 5 years | - |
| Weather and structures | 79 | 3% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 1,373 | 45% | 7% | 49 a day, more than 3 of the other 4 years | - |
| External | 156 | 5% | 4% | 6 a day, the most in 5 years | - |
| Network management | 386 | 13% | 17% | 14 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 225 | 7% | 16% | 8 a day, more than 3 of the other 4 years | - |
| Traincrew | 155 | 5% | 11% | 6 a day, the most in 5 years | - |
| Stations | 44 | 1% | 3% | 2 a day, the most in 5 years | - |
| Operations | 53 | 2% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 46 | 2% | 7% | 2 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 1,324 |
| OU | Delays not Investigated by Network Rail | 244 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 172 |
| IC | Track circuit failure (including no fault found) | 150 |
| TG | Driver | 101 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 89 |
| OM | Technical failure associated with a Railhead conditioning train | 83 |
| MU | Depot operating problem | 79 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 72 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 51 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 5,505 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 5,003 |
| XQ | Swing bridge open for river or canal traffic | 3,155 |
| MD | Technical failures below the solebar | 2,440 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,435 |
| TG | Driver | 2,145 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 2,100 |
| IC | Track circuit failure (including no fault found) | 1,796 |
| J3 | Axle Counter Failure | 1,642 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,486 |