494 delay minutes

The biggest share (27%) of the delay picked up at Greenbank in the four weeks to 9 December 2023 came from other operator causes.

1% of these minutes were knock-on from something that happened elsewhere first. 53% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track143%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power133%16% 0 a day, the least in 5 years-
Weather and structures3<1%7% 0 a day, more than 2 of the other 4 years-
Autumn12124%7% 4 a day, more than 2 of the other 4 years-
External112%4% 0 a day, more than 3 of the other 4 years-
Network management6814%17% 2 a day, more than 3 of the other 4 years-
The operators' causes
Train faults4910%16% 2 a day, more than 3 of the other 4 years1
Traincrew306%11% 1 a day, the most in 5 years-
Stations224%3% 1 a day, more than 2 of the other 4 years-
Operations296%5% 1 a day, the most in 5 years-
Operator, other13527%7% 5 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T99
TTLeaf fall Neutral98
OUDelays not Investigated by Network Rail51
MNBrake and brake systems faults; including wheel flats where no other cause had been identified46
MPRail / wheel interface, adhesion problems (including ice on the running rail)38
TGDriver30
QICautioning due to railhead leaf contamination22
RBPassengers joining/alighting16
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.14
IPPoints failure caused by snow or frost where heaters are fitted but found to be not turned on, not operative or defective13
Since 2018
CodeWhat Network Rail loggedMinutes
J3Axle Counter Failure1,707
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,042
Q3NZ Pumps T984
TTLeaf fall Neutral837
ICTrack circuit failure (including no fault found)743
RBPassengers joining/alighting718
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)580
TH(Senior) Conductor/Train Manager468
IRBroken/cracked/twisted/buckled/flawed rail416
MDTechnical failures below the solebar357