Godstone
762 delay minutes
The biggest share (25%) of the delay picked up at Godstone in the four weeks to 9 December 2023 came from other operator causes.
39% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 58 | 8% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 54 | 7% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 148 | 19% | 7% | 5 a day, the most in 5 years | - |
| External | 13 | 2% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 181 | 24% | 17% | 6 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 23 | 3% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 51 | 7% | 11% | 2 a day, more than 3 of the other 4 years | 1 |
| Stations | 35 | 5% | 3% | 1 a day, the most in 5 years | - |
| Operations | 9 | 1% | 5% | 0 a day, more than 2 of the other 4 years | - |
| Operator, other | 188 | 25% | 7% | 7 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 133 |
| TT | Leaf fall Neutral | 133 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 58 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 51 |
| TG | Driver | 41 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 37 |
| OB | Delayed by signaller not applying applicable regulating policy | 32 |
| IC | Track circuit failure (including no fault found) | 31 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 29 |
| AA | Waiting acceptance into off Network Rail network Terminal or Yard | 20 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 10,504 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,637 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,538 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,434 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,228 |
| TG | Driver | 2,078 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,061 |
| OB | Delayed by signaller not applying applicable regulating policy | 2,008 |
| IC | Track circuit failure (including no fault found) | 1,271 |
| IB | Points failure (including no fault found) | 1,135 |