762 delay minutes

The biggest share (25%) of the delay picked up at Godstone in the four weeks to 9 December 2023 came from other operator causes.

39% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track588%8% 2 a day, more than 2 of the other 4 years-
Signals, points and power547%16% 2 a day, more than 1 of the other 4 years-
Weather and structures3<1%7% 0 a day, more than 2 of the other 4 years-
Autumn14819%7% 5 a day, the most in 5 years-
External132%4% 0 a day, more than 2 of the other 4 years-
Network management18124%17% 6 a day, more than 2 of the other 4 years1
The operators' causes
Train faults233%16% 1 a day, the least in 5 years-
Traincrew517%11% 2 a day, more than 3 of the other 4 years1
Stations355%3% 1 a day, the most in 5 years-
Operations91%5% 0 a day, more than 2 of the other 4 years-
Operator, other18825%7% 7 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T133
TTLeaf fall Neutral133
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.58
OCSignaller including mis-routing (not ERTM /ETCS related)51
TGDriver41
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)37
OBDelayed by signaller not applying applicable regulating policy32
ICTrack circuit failure (including no fault found)31
MPRail / wheel interface, adhesion problems (including ice on the running rail)29
AAWaiting acceptance into off Network Rail network Terminal or Yard20
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)10,504
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,637
JSCondition of Track TSR outside the Timetable Planning Rules3,538
IRBroken/cracked/twisted/buckled/flawed rail2,434
OCSignaller including mis-routing (not ERTM /ETCS related)2,228
TGDriver2,078
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,061
OBDelayed by signaller not applying applicable regulating policy2,008
ICTrack circuit failure (including no fault found)1,271
IBPoints failure (including no fault found)1,135