Leaves on the Line

Gidea Park

GDP Anglia route
CSV JSON

2,899 delay minutes

The biggest share (19%) of the delay picked up at Gidea Park in the four weeks to 9 December 2023 came from the operators' own operations.

85% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track28010%8% 10 a day, more than 1 of the other 4 years4
Signals, points and power38913%16% 14 a day, more than 3 of the other 4 years13
Weather and structures612%7% 2 a day, more than 2 of the other 4 years-
Autumn28810%7% 10 a day, more than 2 of the other 4 years-
External1194%4% 4 a day, the most in 5 years-
Network management38113%17% 14 a day, the least in 5 years7
The operators' causes
Train faults40814%16% 15 a day, more than 1 of the other 4 years14
Traincrew813%11% 3 a day, more than 1 of the other 4 years2
Stations13<1%3% 0 a day, the least in 5 years-
Operations55319%5% 20 a day, more than 3 of the other 4 years10
Operator, other32611%7% 12 a day, the most in 5 years5

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)469
MPRail / wheel interface, adhesion problems (including ice on the running rail)271
Q3NZ Pumps T271
ICTrack circuit failure (including no fault found)221
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.152
M2Delay due to ATO / ETCS equipment119
M0Confirmed train cab based safety system fault (including GSMR)107
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)105
I1Overhead line/third rail defect100
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)98
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.12,405
IRBroken/cracked/twisted/buckled/flawed rail5,191
TGDriver5,055
IBPoints failure (including no fault found)4,257
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)4,165
MDTechnical failures below the solebar3,930
M7Door and Door system faults3,531
M0Confirmed train cab based safety system fault (including GSMR)2,897
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,780
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,776