Guildford
3,263 delay minutes
The biggest share (24%) of the delay picked up at Guildford in the four weeks to 9 December 2023 came from signal, points and power faults.
71% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 209 | 6% | 8% | 7 a day, more than 2 of the other 4 years | 6 |
| Signals, points and power | 768 | 24% | 16% | 27 a day, the most in 5 years | 10 |
| Weather and structures | 226 | 7% | 7% | 8 a day, the most in 5 years | 12 |
| Autumn | 242 | 7% | 7% | 9 a day, more than 3 of the other 4 years | - |
| External | 57 | 2% | 4% | 2 a day, more than 2 of the other 4 years | - |
| Network management | 590 | 18% | 17% | 21 a day, more than 1 of the other 4 years | 16 |
| The operators' causes | |||||
| Train faults | 410 | 13% | 16% | 15 a day, more than 3 of the other 4 years | 16 |
| Traincrew | 461 | 14% | 11% | 16 a day, more than 3 of the other 4 years | 54 |
| Stations | 49 | 2% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 31 | <1% | 5% | 1 a day, more than 1 of the other 4 years | 6 |
| Operator, other | 221 | 7% | 7% | 8 a day, more than 1 of the other 4 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 637 |
| TG | Driver | 255 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 190 |
| Q3 | NZ Pumps T | 164 |
| TT | Leaf fall Neutral | 164 |
| I5 | Possession over-run from planned work | 155 |
| TI | Traincrew rostering problem | 134 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 110 |
| MD | Technical failures below the solebar | 105 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 86 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 24,639 |
| TG | Driver | 8,557 |
| IC | Track circuit failure (including no fault found) | 6,701 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 6,074 |
| IB | Points failure (including no fault found) | 5,887 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 5,480 |
| MD | Technical failures below the solebar | 4,702 |
| I5 | Possession over-run from planned work | 4,230 |
| TH | (Senior) Conductor/Train Manager | 3,854 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 3,525 |