Leaves on the Line

Gillingham (Kent)

GLM Kent route
CSV JSON

1,884 delay minutes

The biggest share (28%) of the delay picked up at Gillingham (Kent) in the four weeks to 9 December 2023 came from other operator causes.

65% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track382%8% 1 a day, more than 2 of the other 4 years1
Signals, points and power814%16% 3 a day, the least in 5 years-
Weather and structures452%7% 2 a day, more than 3 of the other 4 years1
Autumn46024%7% 16 a day, the most in 5 years-
External191%4% 1 a day, the least in 5 years2
Network management31317%17% 11 a day, more than 3 of the other 4 years15
The operators' causes
Train faults1277%16% 5 a day, more than 3 of the other 4 years4
Traincrew18610%11% 7 a day, the most in 5 years13
Stations462%3% 2 a day, the most in 5 years2
Operations472%5% 2 a day, more than 3 of the other 4 years1
Operator, other52228%7% 19 a day, the most in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T460
TTLeaf fall Neutral457
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)109
TGDriver105
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)102
OCSignaller including mis-routing (not ERTM /ETCS related)61
M8Technical failures above the Solebar55
TITraincrew rostering problem48
OGIce on conductor rail/OHLE45
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.36
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,496
TGDriver5,502
IBPoints failure (including no fault found)3,490
J3Axle Counter Failure3,063
XBVandalism or theft (including the placing of objects on the line)1,997
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,971
OCSignaller including mis-routing (not ERTM /ETCS related)1,755
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,652
XPBRIDGE HIT1,642
TTLeaf fall Neutral1,544