Gillingham (Kent)
1,884 delay minutes
The biggest share (28%) of the delay picked up at Gillingham (Kent) in the four weeks to 9 December 2023 came from other operator causes.
65% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 38 | 2% | 8% | 1 a day, more than 2 of the other 4 years | 1 |
| Signals, points and power | 81 | 4% | 16% | 3 a day, the least in 5 years | - |
| Weather and structures | 45 | 2% | 7% | 2 a day, more than 3 of the other 4 years | 1 |
| Autumn | 460 | 24% | 7% | 16 a day, the most in 5 years | - |
| External | 19 | 1% | 4% | 1 a day, the least in 5 years | 2 |
| Network management | 313 | 17% | 17% | 11 a day, more than 3 of the other 4 years | 15 |
| The operators' causes | |||||
| Train faults | 127 | 7% | 16% | 5 a day, more than 3 of the other 4 years | 4 |
| Traincrew | 186 | 10% | 11% | 7 a day, the most in 5 years | 13 |
| Stations | 46 | 2% | 3% | 2 a day, the most in 5 years | 2 |
| Operations | 47 | 2% | 5% | 2 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 522 | 28% | 7% | 19 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 460 |
| TT | Leaf fall Neutral | 457 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 109 |
| TG | Driver | 105 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 102 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 61 |
| M8 | Technical failures above the Solebar | 55 |
| TI | Traincrew rostering problem | 48 |
| OG | Ice on conductor rail/OHLE | 45 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 36 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 6,496 |
| TG | Driver | 5,502 |
| IB | Points failure (including no fault found) | 3,490 |
| J3 | Axle Counter Failure | 3,063 |
| XB | Vandalism or theft (including the placing of objects on the line) | 1,997 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,971 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,755 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,652 |
| XP | BRIDGE HIT | 1,642 |
| TT | Leaf fall Neutral | 1,544 |